In order to further develop the remaining oil of longterm shutdown well and control the
casing damage of highwater cut wells, the current situation of more than 3 100 longterm shutdown wells in Changqing Oilfield is investigated, and
different production logging combination technologies are used to find leakage positon in Z277 demonstration block. The casing damage position is found
through the traditional caliper logging technology, and the longterm shutdown well is temporarily changed to injector, to break the
balance of flow pressure in the wellbore and produce negative pressure fluid. In combination with flow, well temperature, noise, and other logging
means, clear water outlet point of the well is blocked. The results show that the production of Well X is resumed after reconstruction, and the
daily oil production is 20 t. The combined leak detection technology is used to repeatedly verify multiple wells in this block, and the average
production is 197 t/d. This technology is applied to the comprehensive treatment of longterm shutdown wells with casing damaged, which can
effectively find out the water leakage point of casing, with remarkable economic benefits and popularization value.