To further increase the singlewell production and maximize the utilization rate of existing wellhead slots on the Chenghai 2-2
artificial island, Dagang Oilfield attempted to apply the technology of "twinholeinmonobore + bilateral horizontal well" for the first time, that is, 3 or 4 wellbores were drilled in one
wellhead slot, in order to imrpove the drilling rate of reservoir, thereby increasing the drainage area. In the first test well, Zhanghai 3939Z, both laterals were highly deviated. Using
automatic hard shaft alignment, lateral backinsertion cementing, and external casing packerassisted cementing, the cementing of the highly deviated laterals was successfully completed.
Thus, the TAML Level4 completion of the first bilateral well in Dagang Oilfield was realized, with operation risks reduced effectively by avoiding the lost circulation in Sha 1 and Sha 3 and
other cementing problems in high gasbearing Sha 3. The technology of “twinholeinmonobore + bilateral horizontal well” can provide valuable engineering experience and relevant data for
the operation of similar wells.