[1]邓乐,黄船,潘登.安岳气田高温酸性气藏完井技术[J].油气井测试,2019,28(01):52-59.[doi:10.19680/j.cnki.1004-4388.2019.01.009]
 DENG Le,HUANG Chuan,PAN Deng. Completion technology for high temperature sour gas reservoir in Anyue gas field[J].Well Testing,2019,28(01):52-59.[doi:10.19680/j.cnki.1004-4388.2019.01.009]
点击复制

安岳气田高温酸性气藏完井技术()
分享到:

《油气井测试》[ISSN:1006-6977/CN:61-1281/TN]

卷:
28
期数:
2019年01期
页码:
52-59
栏目:
出版日期:
2019-02-25

文章信息/Info

Title:
 Completion technology for high temperature sour gas reservoir in Anyue gas field
文章编号:
1004-4388(2019)01-0052-08
作者:
邓乐1 黄船2 潘登
1. 中国石油集团川庆钻探工程有限公司工程技术处       四川成都       610000
2. 中国石油集团川庆钻探工程有限公司钻采工程技术研究院       四川广汉       618300 
Author(s):
 DENG Le1 HUANG Chuan2 PAN Deng2
 1. Engineering Technology Department, CNPC Chuanqing Drilling Engineering Co., Ltd., Chengdu, Sichuan 610000, China
2. Drilling & Production Engineering Technology Research Institute, CNPC Chuanqing Drilling Engineering Co., Ltd., Guanghan, Sichuan 618300, China
关键词:
安岳气田 高温高压 酸性气藏 试油 完井 井筒完整性 完井液 力学分析
Keywords:
 Anyue gas field high temperature and high pressure (HTHP) sour gas reservoir oil test completion wellbore integrity completion fluid mechanical analysis
分类号:
TE257
DOI:
10.19680/j.cnki.1004-4388.2019.01.009
文献标志码:
B
摘要:
 安岳气田的龙王庙、灯影组等气藏具有埋藏深、高温、产量大、含H2S和CO2等酸性气体且地质条件复杂的特点,给完井作业的工具选材、井筒完整性、施工方案优化、完井液选择等带来了挑战。为确保开发井井筒完整性和长时间安全开采,设计合理完井管柱和工艺,优选材料,优化完井液以及井筒防腐措施,引入试油完井一体化开发理念,建立贯穿油气井整个服役周期的安全井筒屏障,形成高温酸性气藏完井技术,保证了油气井安全。该技术在安岳气田上百口开发井成功应用,累计测试产气量超过5 000×104 m3/d,为保障西南油气田分公司打造百亿气区提供了强力技术保障。整套完井技术对“三高”井具有普遍的适用性。
Abstract:
 The gas reservoirs such as Longwangmiao Formation and Dengying Formation in the Anyue gas field are characterized by complex geological conditions, deep burial, high temperature, high yield, and presence of sour gases such as H2S and CO2, which bring challenges to the completion tool selection, wellbore integrity, optimization of operation scheme, and selection of completion fluid. In order to ensure the wellbore integrity and durable operation of development wells, a completion technology for high temperature sour gas reservoir was developed, including the reasonable design of completion pipe string and process, optimization of materials, completion fluid and wellbore anticorrosion measures, introduction of the concept of integrated oil testing and completion, and establishment of a safe and effective wellbore barrier throughout the service life of wells. This technology has been successfully applied in hundreds of development wells in the Anyue gas field, with the cumulative test gas production exceeding 5 000×104 m3/d. Obviously, it provides a strong technical guarantee for building the Southwest Oil and Gas Field into a 10billionm3 level gas region. This completion technology is applicable to wells with high yield, high pressure and high content of H2S.

相似文献/References:

[1]李加明,黄天朋,金强.雅达瓦兰油田“四高”油气井完井测试工艺技术[J].油气井测试,2019,28(01):25.[doi:10.19680/j.cnki.1004-4388.2019.01.005]
 LI Jiaming,HUANG Tianpeng,JIN Qiang.Completion test technology for "fourhigh" wells in Yadavaran Oilfield[J].Well Testing,2019,28(01):25.[doi:10.19680/j.cnki.1004-4388.2019.01.005]
[2]吴志均,段德祥,王文广,等.明格布拉克构造“五高”深井试油测试技术[J].油气井测试,2020,29(02):13.[doi:10.19680/j.cnki.1004-4388.2020.02.003]
 WU Zhijun,DUAN Dexiang,WANG Wenguang,et al.The oil test technology for “five high” deep well in Mingbulak structure[J].Well Testing,2020,29(01):13.[doi:10.19680/j.cnki.1004-4388.2020.02.003]

备注/Memo

备注/Memo:
 2018-11-01 收稿, 2019-01-08 修回, 2019-01-21 接受, 2019-02-18 网络版发表
国家重大科技专项“大型油气田及煤层气开发”项目子课题“随钻地震波测量技术及高温随钻测量装备”(2016ZX05020-005)、中国石油集团科技项目“高温高压高酸性介质油气井完井技术集成与应用”(2016D-4202)
邓乐,男,1965年出生,高级工程师,1999年11月毕业于西南石油大学油气勘探专业,长期从事油气井完井及试油技术及管理工作。电话:028-86011710;Email:dle_sc@cnpc.com.cn。通信地址:四川省成都市府青路川庆钻探工程有限公司工程技术处,邮政编码:610000。
更新日期/Last Update: 2019-02-13