相似文献/References:
[1]邓乐,黄船,潘登.安岳气田高温酸性气藏完井技术[J].油气井测试,2019,28(01):52.[doi:10.19680/j.cnki.1004-4388.2019.01.009]
DENG Le,HUANG Chuan,PAN Deng. Completion technology for high temperature sour gas reservoir in Anyue gas field[J].Well Testing,2019,28(06):52.[doi:10.19680/j.cnki.1004-4388.2019.01.009]
[2]王鹏.电缆输送式电动液压坐封桥塞技术[J].油气井测试,2019,28(05):39.[doi:10.19680/j.cnki.1004-4388.2019.05.007]
WANG Peng.Wireline electrohydraulic bridge setting technology[J].Well Testing,2019,28(06):39.[doi:10.19680/j.cnki.1004-4388.2019.05.007]
[3]杜卫刚,谢梦春,李博,等. 浅表层小井眼长水平段裸眼砾石防砂技术[J].油气井测试,2020,29(02):50.[doi:10.19680/j.cnki.1004-4388.2020.02.009]
DU Weigang,XIE Mengchun,LI Bo,et al. Openhole gravel sand control technology for long horizontal section of shallow slim hole[J].Well Testing,2020,29(06):50.[doi:10.19680/j.cnki.1004-4388.2020.02.009]
[4]綦宗金. 选择性测试阀特殊井况油气井测试技术[J].油气井测试,2021,30(01):16.[doi:10.19680/j.cnki.1004-4388.2021.01.003]
QI Zongjin. Oil and gas well testing technology using STV in special well conditions[J].Well Testing,2021,30(06):16.[doi:10.19680/j.cnki.1004-4388.2021.01.003]
[5]周元杰,周亮,王晋,等. 伊拉克BLOCK-10区块多功能完井一体化管柱测试工艺技术[J].油气井测试,2021,30(04):19.[doi:10.19680/j.cnki.1004-4388.2021.04.004]
ZHOU Yuanjie,ZHOU Liang,WANG Jin,et al. Integrated multifunctional completion pipe string testing technology of Iraq BLOCK10 block[J].Well Testing,2021,30(06):19.[doi:10.19680/j.cnki.1004-4388.2021.04.004]