[1]高森,杨红斌,韩磊.飓风冲洗工具用于连续管钻磨的试验与评价[J].油气井测试,2022,31(02):42-48.[doi:10.19680/j.cnki.1004-4388.2022.02.008]
 GAO Sen,YANG Hongbin,HAN Lei. Test and evaluation of hurricane flushing tool for coiled tubing drilling and grinding[J].Well Testing,2022,31(02):42-48.[doi:10.19680/j.cnki.1004-4388.2022.02.008]
点击复制

飓风冲洗工具用于连续管钻磨的试验与评价()
分享到:

《油气井测试》[ISSN:1006-6977/CN:12-1485/TE]

卷:
31
期数:
2022年02
页码:
42-48
栏目:
出版日期:
2022-04-25

文章信息/Info

Title:
 Test and evaluation of hurricane flushing tool for coiled tubing drilling and grinding
文章编号:
1004-4388(2022)02-0042-07
作者:
 高森杨红斌韩磊
 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 陕西咸阳 712000
Author(s):
 GAO Sen YANG Hongbin HAN Lei
 Changqing Downhole Operation Company, CNPC Chuanqing Drilling Engineering Company Limited, Xianyang, Shaanxi 712000, China
关键词:
 连续油管钻磨飓风冲洗工具排量冲洗效率室内实验现场试验效果评价
Keywords:
 coiled tubing drilling and grinding hurricane flushing tool displacement flushing efficiency indoor test field test effect evaluation
分类号:
TE353
DOI:
10.19680/j.cnki.1004-4388.2022.02.008
文献标志码:
B
摘要:
连续油管钻磨作业过程中,需反复拖动钻磨工具串完成井筒的冲洗,施工时间长、效率低。在连续油管钻磨工具组合中增加飓风冲洗工具,可提高冲洗阶段排量至设计值以上,清理井筒内大直径固相颗粒,提升了井筒清理效率。通过室内实验及现场试验效果评价,当排量高于500 L/min时,飓风冲洗工具完全开启,马达因液体分流未受损伤,清理井筒排量得到进一步提升,平均钻磨用时减少331%,平均清理井筒用时减少749%,平均施工用时减少527%;而当排量低于400 L/min时,飓风冲洗工具完全关闭。飓风冲洗工具可在确保配套连续油管、井口装置、井筒本质安全的前提下,提升钻磨整体施工效率。
Abstract:
 During the coiled tubing (CT) drilling and grinding operations, the drilling and grinding tool string needs to be dragged repeatedly to flush the wellbore, which is timeconsuming and inefficient. Adding hurricane flushing tool to the CT drilling and grinding tool string can increase the displacement in the flushing stage above the design value to clean out largediameter solid particles in the wellbore, so that the wellbore cleaning efficiency is improved. The results of indoor and field tests show that when the displacement is higher than 500 L/min, the hurricane flushing tool is fully turned on, the motor is not damaged due to liquid diversion, and the displacement for wellbore cleaning is further improved; meanwhile, the average drilling and grinding time is reduced by 331%, the average wellbore cleaning time is reduced by 749%, and the average operation time is reduced by 527%. When the displacement is lower than 400 L/min, the hurricane flushing tool is completely closed. The hurricane flushing tool can help improve the overall efficiency of drilling and grinding while ensuring the intrinsic safety of supporting CT, wellhead devices and wellbore.

相似文献/References:

[1]曹银萍,黄宇曦,于凯强,等. 基于ANSYS Workbench完井管柱流固耦合振动固有频率分析[J].油气井测试,2018,27(01):1.[doi:10.19680/j.cnki.1004-4388.2018.01.001]
 CAO Yinping,HUANG Yuxi,YU Kaiqiang,et al. Natural frequency analysis for fluidsolid coupling vibration of completion string based on ANSYS workbench[J].Well Testing,2018,27(02):1.[doi:10.19680/j.cnki.1004-4388.2018.01.001]
[2]高 超,艾 昆,高 辉,等. 基于施工压力曲线的综合滤失系数测试方法及压裂参数优化[J].油气井测试,2018,27(01):8.[doi:10.19680/j.cnki.1004-4388.2018.01.002]
 GAO Chao,AI Kun,GAO Hui,et al.Test method of total leak-off coefficient and optimization of fracturing parameters based on operation pressure curves[J].Well Testing,2018,27(02):8.[doi:10.19680/j.cnki.1004-4388.2018.01.002]
[3]周小林,高志华,张 冲.龙凤山气田大通径免钻桥塞分段压裂先导试验[J].油气井测试,2018,27(01):62.[doi:10.19680/j.cnki.1004-4388.2018.01.010]
 ZHOU Xiaolin,GAO Zhihua,ZHANG Chong. Pilot tests of staged fracturing involving largediameter drillfree bridge plugs in the Longfengshan gas field[J].Well Testing,2018,27(02):62.[doi:10.19680/j.cnki.1004-4388.2018.01.010]
[4]魏 聪,陈宝新,刘 敏,等. 基于反褶积技术的S气井不稳定试井解释[J].油气井测试,2018,27(01):73.[doi:10.19680/j.cnki.1004-4388.2018.01.012]
 WEI Cong,CHEN Baoxin,LIU Min,et al. Interpretation of pressure transient well testing data of S gas well based on deconvolution technique[J].Well Testing,2018,27(02):73.[doi:10.19680/j.cnki.1004-4388.2018.01.012]
[5]张中宝.塔河油田深抽杆式泵一体化管柱工艺[J].油气井测试,2018,27(02):27.[doi:10.19680/j.cnki.1004-4388.2018.02.005]
 ZHANG Zhongbao.Deep integrated rod pumping string applied in Tahe Oilfield[J].Well Testing,2018,27(02):27.[doi:10.19680/j.cnki.1004-4388.2018.02.005]
[6]李军贤.地层出砂井测试工艺优化[J].油气井测试,2018,27(02):47.[doi:10.19680/j.cnki.1004-4388.2018.02.008]
 LI Junxian.Optimization of testing techniques for wells with formation sand production[J].Well Testing,2018,27(02):47.[doi:10.19680/j.cnki.1004-4388.2018.02.008]
[7]田向东,康 露,杨 志,等.海上油气井快速诱喷测试技术[J].油气井测试,2018,27(02):41.[doi:10.19680/j.cnki.1004-4388.2018.02.007]
 TIAN Xiangdong,KANG Lu,YANG Zhi,et al.Fast testing of induced flows in offshore oil/gas wells[J].Well Testing,2018,27(02):41.[doi:10.19680/j.cnki.1004-4388.2018.02.007]
[8]张 毅,于丽敏,任勇强,等.一种新型可降解压裂封隔器坐封球[J].油气井测试,2018,27(02):53.[doi:10.19680/j.cnki.1004-4388.2018.02.009]
 ZHANG Yi,YU Limin,REN Yongqiang,et al.A new type of degradable setting ball for fracturing packers[J].Well Testing,2018,27(02):53.[doi:10.19680/j.cnki.1004-4388.2018.02.009]
[9]褚春波,郭 权,黄小云,等.有限元分析径向水力压裂裂缝扩展影响因素[J].油气井测试,2018,27(02):59.[doi:10.19680/j.cnki.1004-4388.2018.02.010]
 CHU Chunbo,GUO Quan,HUANG Xiaoyun,et al.Finiteelement analysis on influencing factors for propagation of fractures induced in radial jet hydraulic fracturing[J].Well Testing,2018,27(02):59.[doi:10.19680/j.cnki.1004-4388.2018.02.010]
[10]庞伟.酸性气藏深井产能试井方法[J].油气井测试,2018,27(02):67.[doi:10.19680/j.cnki.1004-4388.2018.02.011]
 PANG Wei.Deliverability test method for deep sour gas wells[J].Well Testing,2018,27(02):67.[doi:10.19680/j.cnki.1004-4388.2018.02.011]
[11]钟宝库,胡忠太,简家斌,等.连续油管技术在管柱变形井中测试应用[J].油气井测试,2018,27(03):40.[doi:10.19680/j.cnki.1004-4388.2018.03.007]
 ZHONG Baoku,HU Zhongtai,JIAN Jiabin,et al.Testing application of coiled tubing technology in well with string deformed[J].Well Testing,2018,27(02):40.[doi:10.19680/j.cnki.1004-4388.2018.03.007]
[12]王奎,张乾,滕俊男,等. 大港油田GY1井钢丝打捞作业[J].油气井测试,2022,31(04):42.[doi:10.19680/j.cnki.1004-4388.2022.04.008]
 [J].Well Testing,2022,31(02):42.[doi:10.19680/j.cnki.1004-4388.2022.04.008]
[13]郑道明. 东胜气田连续油管水平井开滑套工艺[J].油气井测试,2022,31(05):33.[doi:10.19680/j.cnki.1004-4388.2022.05.007]
 [J].Well Testing,2022,31(02):33.[doi:10.19680/j.cnki.1004-4388.2022.05.007]
[14]卢 刚. 页岩气水平井分段压裂作业中全可溶桥塞的应用[J].油气井测试,2022,31(05):38.[doi:10.19680/j.cnki.1004-4388.2022.05.008]
 [J].Well Testing,2022,31(02):38.[doi:10.19680/j.cnki.1004-4388.2022.05.008]
[15]苗久厂. 连续油管智能压力控制射孔与桥塞联作技术[J].油气井测试,2022,31(05):43.[doi:10.19680/j.cnki.1004-4388.2022.05.009]
 [J].Well Testing,2022,31(02):43.[doi:10.19680/j.cnki.1004-4388.2022.05.009]
[16]林清金,沈开元,蒋应飞,等. 连续油管分布式光纤测井技术在产出剖面中的应用[J].油气井测试,2023,32(01):58.[doi:10. 19680/ j. cnki. 1004-4388. 2023. 01. 010]
[17]蔡建平,张建忠,王芳,等. 注气井连续油管酸化技术及效果评价[J].油气井测试,2024,33(01):49.[doi:10.19680/j.cnki.1004-4388.2024.01.009]
 [J].Well Testing,2024,33(02):49.[doi:10.19680/j.cnki.1004-4388.2024.01.009]
[18]刘磊. 连续油管作业中油管变形的判断方法[J].油气井测试,2024,33(02):38.[doi:10.19680/j.cnki.1004-4388.2024.02.007]
 [J].Well Testing,2024,33(02):38.[doi:10.19680/j.cnki.1004-4388.2024.02.007]
[19]谢进,刘述忍,刘凯,等. 河油田T1-5H井泵送桥塞分段加砂压裂工艺[J].油气井测试,2024,33(03):53.[doi:10.19680/j.cnki.1004-4388.2024.03.009]
 [J].Well Testing,2024,33(02):53.[doi:10.19680/j.cnki.1004-4388.2024.03.009]
[20]刘志尧,管彬,刘佳林,等. 深层页岩气连续油管钻磨桥塞技术[J].油气井测试,2024,33(04):17.[doi:10.19680/j.cnki.1004-4388.2024.04.003]
 [J].Well Testing,2024,33(02):17.[doi:10.19680/j.cnki.1004-4388.2024.04.003]

备注/Memo

备注/Memo:
2021-06-02收稿,2022-01-20修回,2022-02-25接受,2022-04-20网络版发表
中国石油集团公司推广专项“连续油管作业技术专项推广”(二期)(2017B-4107)
高森,男,1982年出生,工程师,2006年毕业于陕西科技大学测控技术与仪器专业,现从事连续油管修完井技术服务及工程技术研究方面的工作。
电话:029-86021700,18092493479;Email:277103489@qq.com。通信地址:陕西省咸阳市朝阳七路长庆井下生产科研基地,邮政编码:712000。
更新日期/Last Update: 2022-05-07